Calculate Construction Cost
Building Covered Area (Net)
Building footprint only (excludes yard)
m²
50m²
800m²
Detailed Floors (List)
Finishing Quality
Economy
Standard
Luxury
Current Land Price (Total)
LYD
Boundary Wall
meters
Include in Estimate:
Water Well
Underground Cistern (15,000L)
Septic Tank (15,000L)
Elevator
Motorized Gate
Swimming Pool (4x8m)
Total Cost
LYD
728,750
Skeleton (Azm) Cost:
162,500
LYD
Finishing Cost:
500,000
LYD
Safety Buffer:
66,250
LYD
Live Market Prices
These prices directly affect your Skeleton (Azm) estimate.
Steel (per Ton)
3,650
LYD
Cement (per Bag)
39.5
LYD
Safety Buffer
10%
These costs are just estimates and may vary based on daily material rates.
Calculate
construction cost
Total Cost
LYD
728,750
Skeleton (Azm) Cost: 162.5k
Finishing Cost: 500k
Safety Buffer: 66.3k
Detailed Floors (List)
Building Covered Area (Net)
Building footprint only (excludes yard)
m²
Finishing Quality
Economy
Standard
Luxury
Current Land Price (Total)
LYD
Boundary Wall
meters
Include in Estimate:
Water Well
Underground Cistern (15,000L)
Septic Tank (15,000L)
Elevator
Motorized Gate
Swimming Pool (4x8m)
Live Market Prices
These prices directly affect your Skeleton (Azm) estimate.
Steel (per Ton)
3,650
LYD
Cement (per Bag)
39.5
LYD
Safety Buffer
10%
These costs are just estimates and may vary based on daily material rates.